WaiverGate

Lien waivers in before the check goes out

A simple waiver request, reminder and payment-hold log for small general contractors. Request every sub's waiver, check the amounts, and see which payments are clear to pay, without a full construction platform.

Free. You get one email when the first version is ready.

You are on the list. Thank you!

The check is ready. The waiver is somewhere in email.

This is what construction accountants and small GCs keep describing. The waiver step lives in inboxes, folders and spreadsheets, so payments go out before the paperwork is done.

Payments often go out without a signed waiver, then paper copies get mailed to subs to sign and send back.

Waiver PDFs sit in a folder named emailed and get moved to signed when they come back by email or someone drops one off.

A spreadsheet with a tab for each project, each sub highlighted until their waiver comes in.

Small mistakes on the form mean rejected waivers and late payments. Chasing corrected waivers is infuriating.

A full system like Procore is more than needed, and Textura prices by the dollar amount of the contract.

A contractor's office desk with stacks of clipped paperwork marked by orange, green, pink and blue sticky flags, a rubber stamp, a closed laptop, rolled blueprints and a yellow hard hat on a filing cabinet.
Illustrative image.

Keep the flags. Lose the stacks.

Plenty of offices run the pay run on clipped stacks and colored flags that mark what is still missing. WaiverGate puts those flags on one board, so nobody cuts a check while a waiver is still out.

Amber · requested, waiting on the subGreen · signed and checkedPink · rejected, correction neededBlue · unconditional, after payment

One payment, from pay app to final waiver

Follow a single framing payment through WaiverGate. Your accounting software still cuts the check; WaiverGate makes sure the waiver comes first.

  1. Nov 1

    Request

    Tom's pay app comes in. WaiverGate emails him a conditional progress waiver link with the amount and through date filled in.

  2. Nov 8

    Reminders

    No signature yet, so WaiverGate sends reminders and keeps the payment on hold.

  3. Nov 12

    Check and approve

    Tom uploads the signed PDF. Amount, through date and project are checked against the pay app before anyone approves it.

  4. Nov 15

    Pay, then unconditional

    Your AP team pays as usual. WaiverGate requests the unconditional waiver and files both in the project packet.

What the first version will do

  • Projects, a sub and vendor directory, and waiver request templates by project and pay period
  • Waiver requests by email link with PDF upload, with e-sign as a pluggable option
  • A status board for requested, received, rejected and approved, with automatic reminders
  • Amount and retainage fields with visible math checks against the pay app
  • A payment-hold state your AP team checks before cutting a check, plus an audit timeline
  • Downloadable waiver packets per project, CSV import and export, and role-based access

What it will not do

  • Replace Procore, Textura or your accounting software. It sits next to them.
  • Hold, move or release anyone's money. Your AP team pays the way it does today.
  • Give legal advice or research lien rights. State-specific waiver text is yours, labeled as a template.
  • Charge a percentage of your contract value. One flat monthly price.

Become a founding member

Pay $39 now. It becomes your first month of WaiverGate Solo, and $39 a month stays your founder price for life. Fully refundable on request at any time before launch.

$39

One payment, becomes your first month

  • Founder price of $39 a month, locked for life
  • Solo plan: 10 active projects and unlimited waiver requests
  • Fully refundable on request any time before launch
Preorder for $39

Thank you for preordering! Check your inbox for the receipt.

Who is building this

I'm Emad, a software developer who builds small tools for niche businesses. I kept reading construction accountants and small GCs describe the same routine: waiver PDFs by email, a spreadsheet tab per project, and checks that go out before the signed waiver comes back. Before I build WaiverGate, I want to hear from people who actually run pay apps. If this would help you, join the list or tell me what I am missing. I have never run a construction job, so your input shapes what gets built.